The project specification defines the test methods and the acceptance limits. Confirm them before testing begins, so the results can be judged against the right numbers.
Dirty or damaged connectors cause many failed tests. Inspect with a scope and clean before testing, and record the inspection when the specification asks for it.
Longer single-mode links at higher data rates may also call for ORL, chromatic dispersion and PMD results. Ask early, because the right equipment has to be on site.
Deliver results in a consistent structure by cable, panel and link, so the customer can find any fiber quickly. Keep the originals so a failed link can be traced back.
Link identification, method, result, limit, trace files and any retest records.
The project specification does.